
Chile
Cururos Wind Farm Project
The Cururos Wind Farm Project includes two wind farms called “El Pacifico" and “La Cebada" with a total installed capacity of 109.6 MW and an average generation of 290 GWh per year. The wind farm is connected to the Central Interconnected System (SIC)